Autumn Meadow-Deerfield Village Drain

Drain Established 1997

Petition

 

Residents submitted the petition with the required minimum of five freeholders. A Board of Determination (BOD) meeting was held on October 28, 2025, where the petition was approved.

During public comment, many residents voiced concerns about neighborhood-wide ponding, flooding, and stormwater infrastructure issues.

Prein & Newhof is now televising the system to assess pipe conditions before beginning the design phase. 

Board of Determination Meeting

Engineer

Company: Prein&Newhof

Project Manager: Lucas Timmer, P.E.

Contact: 616-394-0200

 